Availability of project documentation for major repairs. Technical documentation for overhaul facilities

Technical documentation for capital repairs includes:

Initial permit documentation;

materials engineering surveys;

Design and estimate documentation;

executive documentation.

Design and estimate documentation for overhaul buildings and facilities are developed by design organizations on the basis of contracts with the UESIOKU of the military districts.

The development of design estimates for major repairs is preceded by the preparation of object-by-object inventories of work and acts of the technical condition of structures at the time of the survey.

The design and estimate documentation includes:

General explanatory note;

Architectural and construction solutions;

Technological solutions for built-in non-residential premises;

Solutions for engineering equipment;

Major overhaul organization project;

Project technical operation building;

Estimated documentation.

The project for the overhaul of the building, developed in a two-stage design, includes:

a) a general explanatory note;

main drawings: situational plan; a scheme of the master plan indicating the existing, repaired and designed buildings, the volume of improvement and landscaping, principal decisions on external engineering networks;

b) building solutions containing short description architectural and construction plans, basic measures for water supply, ventilation, sewerage, gas and electricity supply, measures to protect structures, a list of applicable standard and repeated projects, structures and assemblies, plans for civil defense (drawn up in the prescribed manner);

main drawings: plans, sections and facades of buildings with a schematic representation of load-bearing and enclosing structures; working drawings for non-standard structures, assemblies, diagrams;

in) engineering sections(water supply, sewerage, heating, electricity supply, etc.), containing a brief description of the sources of supply and decisions taken, a list of typical and reusable projects, structures, units;

main drawings: plans, diagrams, sections with a schematic representation of structures; route plans on geomaterials in M ​​1:500; working drawings for non-standard units, parts, track profiles;

d) a project for the organization of repairs, developed in the composition and scope provided for by VSN 41-85 (p) Gosgrazhdanstroy;

e) the section "Technical maintenance of buildings", containing the basic provisions for the maintenance of the building, information about disconnecting devices, nodes that require the most attention during operation;

e) budget documentation.

The composition of the working documentation for the repair of buildings should include:

construction design documentation systems (SDPS);


statements of volumes of construction and installation works;

statements and summary statements of material requirements;

specifications for equipment drawn up in the form established by the SDPS, questionnaires and dimensional drawings.

The general explanatory note to the design and estimate documentation contains:

basis for design;

brief description building (complex), including urban planning issues (if necessary);

master plan, landscaping, landscaping;

a brief description and justification of architectural and construction solutions for the building (complex):

a) architectural and planning solutions;

b) constructive solutions;

c) engineering solutions;

technological equipment built-in non-residential premises;

basic solutions for water supply, sewerage, heating, ventilation, power supply, low-current devices;

a list of typical and reusable projects of parts, assemblies used in the project;

solution of civil defense issues;

basic provisions for the organization of repairs;

basic provisions for the technical operation of the building (complex).

For technically simple objects, the composition and volume of design materials may be reduced by decision of the design organization.

If by nature repair work the development of drawings is not required, then only estimates are made on the basis of a list of works. The need to develop drawings is established by the design organization.

For buildings and structures with special complex structures and the conditions for the production of works, the repair of which is carried out using special (individual, non-standard) auxiliary structures, devices, devices and installations regulated by the requirements for the organization of construction production, design organizations that design repairs must develop drawings of these structures, devices, devices and installations .

The composition of the estimate documentation is given in table 6.2.

The composition of the estimate documentation

Table 6.2

For single stage design For two-stage design
working draft Project working documentation
Consolidated estimate calculation 1 Consolidated estimate calculation 2 Object estimates according to working drawings
Cost Summary Cost Summary Local estimates according to working drawings
Object estimates3 Object and local estimates
Local estimates3 Estimates for design work and engineering survey of the building bill of materials
Estimates for the design of work and engineering and technical inspection of buildings Vedomosti estimated cost repair of objects included in the corresponding complex (queue) of repair Explanatory note
List of estimated cost of repair of objects included in the corresponding complex (queue) Explanatory note
bill of materials
Explanatory note
_____________ 1. Determined according to object and local estimates compiled according to working drawings using price lists intended for this purpose, aggregated estimated norms, aggregated and unit prices for repair, construction and installation work during major repairs. 2. It is determined by the aggregated estimated norms (price lists, aggregated estimated norms, aggregated prices), aggregated indicators of the cost of repairs and cost indicators of analogous objects. 3. In the absence of price lists and enlarged estimated norms. Note. When drawing up estimates according to price lists, the documentation includes a statement of the scope of work.

When developing working documentation for the repair of facilities, the design organization must carry out the necessary revision and specification of the fundamental architectural, construction and other decisions made in the approved project.

Working documentation is developed as a whole for the repair of the entire building or start-up complexes (queues). Working documentation for individual objects with a repair period of up to one year is developed and issued as a whole for these objects.

An explanatory note is attached to the estimate documentation as part of the working draft, which contains:

indications in what prices and norms of what year the estimate documentation was drawn up;

name of the general contractor;

the size of overhead costs and planned savings;

the procedure for determining the estimated cost of repair work;

the procedure for determining the estimated cost of equipment and its installation;

the procedure for determining funds for the chapters of the consolidated estimate.

In the event that when calculating funds for other work and costs there are references to the reporting data of contractors and other organizations, copies of the relevant documents must be attached:

indicators of labor costs, the cost of the basic salary, the use of mechanisms and materials;

justification for the reuse of materials from disassembly in accordance with VSN 39-83 (p) Gosgrazhdanstroy;

technical and economic indicators;

sources of financing for capital repairs.

In the summary estimate of the cost of repairs, the funds are distributed according to the following chapters:

1. Preparation of the overhaul site;

2. Main facilities;

3. Objects of ancillary and service purposes;

4. External networks and structures (water supply, sewerage, heat supply, gas supply, etc.);

5. Improvement and gardening of the territory;

6. Temporary buildings and structures;

7. Other works and expenses;

9. Design work.

The consolidated estimate calculation includes: funds for preparing the territory, demolishing and transferring buildings and structures (including houses and buildings owned by citizens on the basis of personal property rights) located on land plot if their further use for their intended purpose is impossible; implementation of measures related to the violation of the natural environment; limited costs; compensation determined by the decisions of the legislative bodies.

In the summary estimate, a separate line provides for a reserve of funds for unforeseen work and costs.

For the result of the consolidated cost estimate, the refundable amounts are indicated.

A summary of costs is compiled when it is planned to repair a group of houses and houses with built-in premises. At the same time, in separate view works, external networks common to a group of houses can be allocated. A summary of costs can combine two or more summary cost estimates.

Object and local estimates, compiled according to working drawings, determine the estimated cost of individual objects, their parts or types of work and are the basis for determining the estimated cost of the object. This cost is determined according to price lists intended for this purpose, aggregated estimated norms, aggregated prices and estimates tied to local repair conditions to standard and reusable economical individual projects, and in the absence of these norms and estimates - at unit prices for construction and repair work and prices for equipment installation.

Object and local estimates are made according to the forms of object and local estimates. The cost in the estimated calculations is determined, as a rule, using enlarged estimated norms.

Additional funds for reimbursement of the contractor's costs that are revealed after the approval of the working draft in connection with the introduction of multiplying factors, benefits, compensations, etc., are included in the summary calculation in a separate line, followed by a change in the final indicators of the cost of repairs and approval of production clarifications by the authority that previously approved the project .

Test

in the discipline "Organization of urban economy"

On the topic: "Design and estimate documentation for major repairs"



Introduction

Technical inspection, types of repairs

Conclusion

Literature

Application


INTRODUCTION


There is a widespread opinion that the overhaul of buildings is technically simple and can be carried out on the basis of primitive technical documentation or even without it. This opinion is erroneous in relation to residential and public buildings and doubly erroneous in relation to industrial buildings and structures, which are distinguished by the variety and complexity of design solutions.

When restoring or replacing worn, damaged or destroyed structures and parts of industrial buildings, it is only in rare cases possible to repeat the original design solution; most often it is necessary to look for new constructive solutions and new ways of their implementation in the conditions of existing production. This requires those involved in the development of repair technical documentation, serious engineering knowledge and experience in the construction and operation of industrial buildings.


1. Technical inspection, TYPES OF REPAIRS


The basis for ensuring the safety of buildings and their equipment is a system of timely inspections.

There are scheduled and unscheduled (extraordinary) inspections. Scheduled inspections are divided into general and partial.

Unscheduled inspections are carried out after heavy rains, hurricane winds, heavy snowfalls, floods and other natural phenomena that cause damage individual elements buildings, as well as in case of accidents or in case of detection of deformation of structures and malfunction of engineering equipment that violate the conditions of normal operation.

The purpose of these inspections is to determine possible causes occurrence of defects and the development of measures to eliminate them. In the course of their implementation, control over the use and maintenance of the premises is also carried out.

General technical inspection is carried out twice a year: in spring and autumn (before heating season).

The following scheduled inspections of residential buildings are carried out:

  1. general, during which the building is inspected as a whole, including structures, engineering equipment and external landscaping;
  2. partial, which provide for the inspection of individual elements of a building or premises.

Defects discovered during inspections, deformations of structures or equipment of buildings that can lead to a decrease in bearing capacity and the stability of structures or buildings, collapse or disruption of the normal operation of equipment, are eliminated by the owners with the involvement of the organization for the maintenance of the housing stock (or under an agreement with any other for the performance of a specific type of work) in time.

The housing maintenance organization must take urgent measures to ensure the safety of people, prevent further development deformations, as well as immediately inform the owner of the housing or a person authorized by him about the incident.

The results of continuous surveys of the state of the housing stock, performed periodically, are documented in acts.

The organization for servicing the housing stock on the basis of acts of inspections and surveys must, within a month:

a) draw up a list (based on the results of the spring inspection) of measures and establish the scope of work necessary to prepare the building and its engineering equipment for operation in the subsequent winter period;

b) clarify the scope of work on current repairs (based on the results of the spring inspection for the current year and the autumn inspection for the next year), as well as determine the malfunctions and damage, the elimination of which requires major repairs;

in) check the readiness (according to the results of the autumn inspection) of each building for operation in winter conditions;

Elimination of minor faults, as well as the adjustment and adjustment of sanitary fixtures and equipment should, as a rule, be carried out by the housing organization.

Unforeseen current repairs (unscheduled) are detected during operation and are usually carried out urgently.

Scheduled maintenance includes works on selective repair and painting of roofs, replacement of missing parts and painting downpipes, partial repair of floors, windows and doors, cleaning of dirt and partial painting of walls and ceilings of main and auxiliary premises, replacement of fittings for sanitary equipment, wiring accessories and ballasts.

Overhaul is divided into major (simultaneous restoration of all worn-out structures and equipment is envisaged) and selective (individual worn-out structures, equipment or parts thereof are replaced, and defects identified during operation are eliminated).

When performing a major overhaul, the work included in the current repair.

The frequency of maintenance and overhaul of buildings should be taken taking into account their capital, architectural, planning and design solutions, the availability of engineering equipment and operating conditions, in accordance with the Regulations on the preventive maintenance of residential and public buildings.


2. Design and estimate documentation for overhaul


When developing design and estimate documentation, it is necessary to be guided by:

normative documents on design and construction, approved by the Gosstroy of Russia, as well as regulatory documents related to design and construction, approved by ministries and other federal bodies executive power;

state standards construction design; normative and guiding documents on the issues of technology and organization of construction production;

state and departmental building catalogs of standard prefabricated reinforced concrete, metal, wood and asbestos-cement structures and products;

catalogs for equipment, etc.

The main document regulating legal and financial relations, mutual obligations and responsibilities of the parties is an agreement (contract) concluded by the customer with the design, design and construction organizations, other legal and individuals.

An integral part of the agreement (contract) should be the design task.

The design task should contain the following initial data:

Name, address of the projected object.

Basis for design (decision of the executive authority, order of the ministry or department).

Staged design.

Data about special conditions sites and areas.

Purpose and types of built-in non-residential premises, their design capacity, capacity or throughput, composition and area of ​​premises, working area.

Basic requirements for the architectural and planning solution of the building.

Basic requirements: for engineering and technological equipment; to constructive solution and materials of load-bearing and enclosing structures; to the decoration of buildings; to the maximum mass of elements of prefabricated structures.

An indication of the allocation of queues (complexes) for major repairs.

Basic requirements for engineering and technological equipment (for built-in premises).

Requirements for ensuring the living conditions of the population of a residential building.

Requirements for site improvement and small architectural forms.

Measures for civil defense and emergency situations.

Instructions on the need: development of options for design solutions, specifying the number of options; preliminary coordination of design decisions with interested departments and organizations; development of interiors of premises; implementation of demonstration materials as part of the project (volume and form).

The name of the design organization - the general designer.

The name of the repair and construction organization - the general contractor, as well as information about the enterprises where structures and products can be manufactured.

Terms and order of repair.

Together with the design assignment, the customer issues the following documents and materials to the design organization: justification of investments for the overhaul of a residential building or a complex of buildings; permit for major repairs; available materials of topographic survey of the site where the building is located, and data from geological and hydrogeological surveys; materials on existing and preserved buildings and green spaces; information about above-ground and underground engineering structures and communications; inventory materials, appraisal acts and decisions of the local administration on the demolition and the nature of compensation for the demolished structures (if they are on the site); permission (technical conditions) for connection to external engineering networks and communications (during the census, connecting networks: sewerage, water supply, gas, heating networks, power supply cables); information about the background state of the natural environment, the comfort of living for the population, the presence of man-made objects near the repaired residential building and their impact zones in case of possible emergency situations; the main measures to ensure the normal operation of sections, apartments, premises for the period of repair and adjacent buildings during the overhaul of residential buildings in stages (complexes); task from the inspection for the protection of architectural monuments (if necessary); materials on previous technical surveys; act of the operating organization on the technical condition of the building structures, structural elements and engineering equipment (according to the last inspection); inventory floor plans indicating the area of ​​​​the premises and the volume of the building according to the Bureau of Technical Inventory (BTI), carried out within 3 years before the start of design; technical conclusion based on the results of the survey of a residential building; building passport indicating the amount of physical wear of structures and engineering equipment, volumes, terms and types of previously performed repairs; certificate of the state of gas networks and equipment; act of the operating organization, approved by the district (city) housing department for the replacement of sanitary equipment and an apartment-by-apartment inventory of repair work (for facilities being repaired without stopping operation); certificates from operating organizations on the condition of elevators, unified dispatching systems (ODS), central heating points (CHP), etc.; the decision of the administration of the city or other locality on the appointment of built-in non-residential premises; task for designing the technology of built-in non-residential premises; permission to close traffic and diversion of transport, opening pavement.

The preparation of technical documentation for the overhaul of buildings begins with the selection of objects to be repaired in the planned year. The selection is made by employees of the construction and maintenance service of the enterprise together with persons directly responsible for the technical condition of the facilities (caretakers of the buildings of workshops, industries). When selecting, the technical condition of the facilities is examined using the available design and operational documentation: drawings of the main project, drawings and estimates for previously carried out repairs, technical passports and operation logs, acts of periodic and extraordinary technical inspections and other data characterizing the technical condition of the facility.

The surveying persons give a brief technical description of the type of repair required, determine the volume of the main types of work, their estimated cost, the desired time frame for the repair and the type of repair required. project documentation: drawings or technical descriptions of work (defective lists).

Based on the survey materials, a list of objects selected for major repairs for the planned year is compiled. The statement is signed by the persons who made the selection and the head of the construction and maintenance service of the enterprise; it is subject to approval by the chief engineer of the enterprise. The approved list of objects selected for overhaul is a task for the development of working design and estimate repair documentation. Its development is carried out either by design and estimate divisions of enterprises, or by specialized design organizations.

Development of design estimates for the overhaul of industrial buildings includes:

a) a detailed examination of the objects to be repaired, with the production of measurements and openings, drawing up sketches and detailed descriptions of the work;

b) preparation of working design documentation in the form of drawings or descriptions of work (defective statements) for each individual object;

c) preparation of estimates according to the descriptions and drawings of the project for each individual object.

In practice, the development of repair design and estimate documentation is often limited to the compilation of defective statements and estimates. The defective statement is compiled on the basis of an inspection of the object in kind with the production of the necessary autopsies to expose individual components of the structures that are not available for inspection. It should contain a list of repairs to be performed on individual structural elements, indicating the units of measure of work corresponding to the nomenclature of the current estimate guide or unit prices for repair and construction work. The defective list reflects the possibility of using old material obtained from dismantling, and indicates the amount of material added to the repaired structure.

Estimates of the volume of work are carried out in such a way that they exclude the possibility of arithmetic errors and provide the possibility of a quick and easy check, for which you should:

a) all calculations for this object are divided into departments (structural elements);

b) keep the count in a certain order, for example, start it from the foundations and end with the ceiling or vice versa, depending on the nature of the repair;

c) apply a single procedure for writing calculation formulas; if, for example, when calculating the area in the first formula, the product of length and width is taken, then in subsequent formulas, the width indicator should follow the length indicator;

d) avoid discrepancies between dimension records and dimensions in kind, on a drawing or sketch;

e) do not preliminarily add numbers - indicate all calculations in formulas;

f) express all linear dimensions and partial results of the scope of work as a decimal fraction with two decimal places, even if they are zeros, for example 3.25; 4.00.

Calculations are carried out so that the data of one department can be used in calculating the volumes of another department. Each defective statement must be subject to careful control and have the signatures of the compiler and the inspector.

Estimates (Appendix 1.). According to the estimates, the amount of cash costs for the repair of buildings is determined. If the estimate is drawn up correctly, then it contributes to the expedient expenditure of public funds and the rational organization of repair work. Therefore, when drawing up estimates for the overhaul of industrial buildings and structures, it is necessary:

a) proceed from correctly accounted for the amount of work;

b) provide for the most rational ways and methods of work, their maximum mechanization, taking into account the real material and technical capabilities of the repair organization;

c) be guided by the official current budget guides or collections of unit prices for repair and construction work;

d) accurately determine the cost of repair work, since errors in the direction of its overestimation lead to overspending of public funds, and errors in the direction of underestimation of the cost - to the disorganization of repair work, and often to a decrease in their quality.

For structures and types of work for which there are no single unit prices, additional unit prices are compiled on the basis of the current estimated or production standards.

Estimates for repair and construction work are compiled by sections, according to the nomenclature of the estimate guide or collection of unit prices, summing up the cost for each section, without charges.

At the end of the estimate, the total cost of direct costs for all structural elements and types of work is summed up, the total cost of repairs is determined, taking into account overhead and contingencies, the cost of compiling design estimates, and in the case of a contractual method of work, planned savings.

All material and technical resources necessary for the repair of industrial buildings and structures are calculated according to the norms of the current budget guides.

overhaul technical inspection overhaul


CONCLUSION


Overhaul is the replacement and restoration of individual parts or entire structures and engineering and technical equipment of buildings due to their physical wear and tear and destruction.

The frequency of overhauls is determined in accordance with the current instructions for carrying out scheduled preventive repairs, developed and put into effect taking into account the requirements of the rules and instructions of the relevant state supervision bodies. Overhaul periods and volumes of repairs are established based on the technical condition and design features objects.

The composition of the overhaul also includes works that, by their nature, are related to current repairs, but are performed in connection with the production of major repairs.

Capital repairs are divided into:

repair, covering the entire building as a whole or its individual sections, in which physical and moral deterioration is eliminated;

selective repair, covering individual structural elements of a building or equipment, which eliminates physical wear and tear.

Design and estimate documentation is developed by design, design and survey organizations, construction companies(firms) that have the right (license) to conduct design work.

The design of the overhaul of residential buildings should be carried out on the basis of perspective and annual plans approved in the prescribed manner.

Inclusion in the plan for the overhaul of residential buildings, regardless of departmental affiliation, is coordinated with local governments that are in charge of construction and housing and communal services.

The decision to carry out a major overhaul is made by the local government (investor) on the basis of determining the degree of deterioration of their architectural and historical value.

The design of the overhaul of residential buildings should be carried out taking into account the approved general plans of cities and rural settlements, planning projects, development projects for blocks, microdistricts and other elements of the planning structure, development schemes engineering networks, project proposals for the reconstruction of neighborhoods, groups of houses, large residential formations, areas of transport routes.


LITERATURE


1. "Organization of the current repair of the housing stock in the field of urban economy": Tutorial/ VlGU. Vladimir, 2001

2.E.M. Korostylev "Economics, organization and planning of machine-building production". M., " graduate School", 2002

GOST 21.001-93 Design documentation system for construction (SPDS). General provisions

GOST 21.101-97 SPDS. Basic requirements for design and working documentation

Civil Code Russian Federation. Part I and II, 1997

housing code RSFSR (as amended on August 22, 1995)

Toolkit to determine the estimated cost of capital repairs of residential buildings, communal and socio-cultural facilities. Letter from the Gosstroy of Russia dated 11/12/97


Application







STATEMENT OF THE ESTIMATE COST OF OBJECTS AND WORKS FOR THE PROTECTION OF THE ENVIRONMENT

Chief Project Engineer _________________________

(signature, full name)


Tutoring

Need help learning a topic?

Our experts will advise or provide tutoring services on topics of interest to you.
Submit an application indicating the topic right now to find out about the possibility of obtaining a consultation.

Requirements for the composition and content of sections of project documentation in the course of construction, reconstruction and overhaul of facilities capital construction defined by law.The main document governing this is

« Composition and requirements for the content of sections of project documentation applied to various types capital construction facilities, including linear facilities, the composition and requirements for the content of design documentation sections in relation to individual stages of construction, reconstruction of capital construction facilities, the composition and requirements for the content of design documentation sections during the overhaul of capital construction facilities, as well as the composition and requirements for the content of sections of project documentation submitted for state examination of project documentation and to state construction supervision bodies are established by the Government of the Russian Federation.()

working documentation is developed in order to implement architectural, technical and technological solutions in the construction process.

The regulation does not contain instructions on the sequence of development of working documentation, which determines the possibility of its implementation, both simultaneously with the preparation of project documentation, and after its preparation. At the same time, the volume the composition and content of the working documentation should be determined by the customer (developer) depending on the degree of detail of the solutions contained in the design documentation, and indicated in the design assignment. (see Letter dated June 22, 2009 N 19088-SK / 08 Ministry of Regional Development of Russia)

The final set of design and estimate documentation, as a rule, includes design and working documentation ( Note. This is one of the main differences from the "P" and "RP" design stages, when only the documentation of the "RP" stage goes into the final project.). These types of documentation complement each other:

  • The project documentation includes the main sections on the organization of construction("Explanatory note", "Construction organization project", "Measures to ensure fire safety"," Estimate for the construction of capital construction facilities ", etc.).
  • Working documentation contains working drawings, documents, specifications and is the basis for the implementation of the decisions taken in the project.

Project documentation

Reference

The list of design documentation is usually given in the section "Composition of design documentation" (section code - "SP"). This section is most often found in Volume 0.

If necessary, at the initiative of the customer, project documentation is developed in relation to individual stages of construction, reconstruction of facilities. (cm. ). This is indicated in the design assignment.

Design documentation for individual stages of construction is developed in the volumes necessary for the implementation of each stage of construction. It must meet the requirements for the composition and content of sections of project documentation established by the Regulations for capital construction projects.

Reference:

Under construction phase means the construction of one of the capital construction objects, the construction of which is planned to be carried out on one land plot, if such an object can be put into operation and operated autonomously, that is, regardless of the construction of other capital construction objects on this land plot, as well as the construction of a part of the capital construction object , which can be put into operation and operated autonomously, that is, regardless of the construction of other parts of this capital construction facility.

We offer services for the development of design and estimate documentation (PDD) for construction, overhaul, reconstruction of industrial, public and administrative facilities in any region of Russia.

  • We are a member of design, construction and survey SROs.
  • Included in the register of verified suppliers.
  • ISO quality certificates.
  • Guarantee of obtaining a positive conclusion of the examination.
  • A team of professional designers.
  • We develop all sections of project documentation in accordance with Decree No. 87 of the Government of the Russian Federation, which meets all requirements terms of reference and current legislation.
  • You get a complete set of design estimates and working documentation.

Order a project calculation - send a request

Design and estimate documentation, or abbreviated design and estimate documentation, is a package of text and graphic materials that describe the architectural, structural, functional, technological, engineering and technical solutions of a building or structure. Projects are developed for construction, reconstruction, overhaul of facilities.

Why do you need design and estimate documentation?

Design and estimate documentation is necessary for the reconstruction, capital construction or repair of facilities, regardless of their purpose. The exception is low-rise residential buildings - no higher than 3 floors, for which the development of design and estimate documentation is not required.

A well-designed design and estimate documentation is needed to obtain the desired result during repair or construction. It allows you to confirm or refute the compliance of the final result with the planned one by comparing the technical characteristics prescribed in the project with the real ones. Design and estimate documentation ensures the rational use of materials and provides objective information on the cost of work.

Design and estimate documentation is a kind of plan, guided by which, the construction team will subsequently erect, reconstruct or repair a building or premises.

Moreover, design and construction documentation clearly demonstrates the economic attractiveness of the planned facility for potential investors.

What facilities do we design?

We design objects of residential and commercial real estate, social sphere:

  • Residential cottages and high-rise buildings
  • Residential complexes
  • Objects of the social sphere
  • Public buildings
  • Industrial buildings for any purpose
  • Warehouses
  • Office and shopping and entertainment centers
  • Engineering Communication

Examination of design and estimate documentation

According to Article 49 of the Town Planning Code of the Russian Federation, project documentation is subject to state or non-state expertise. Expert opinion issued for projects and engineering surveys for all objects with a height of 3 floors and an area of ​​1,500 m2.

The examination is aimed at confirming the compliance of the solutions used in the design and estimate documentation technical regulations in the field of environmental and sanitary and epidemiological safety, protection of cultural heritage sites, etc. Without a positive expert opinion, it is impossible to obtain a building permit.

The procedure for the development of design estimates in the IC "OLIMP"

    Filing an application. Contact our managers through the form feedback on the website, by phone or e-mail.

    Detailed consultation on the procedure for the provision of services.

    Calculation of the cost of drawing up project documentation based on the data provided by the customer.

    Conclusion of the contract and payment for services.

    Holding preparatory work including engineering surveys.

    Drawing up a package of project documentation and estimates, examination and approval of design and estimate documentation.

    Development of working drawings.

    Transfer of the project and working documentation to the customer.

Order services for the development of design and estimate documentation at IC OLIMP, because our company:

    Performs work on the preparation of design and estimate documentation for any objects: public, industrial, industrial, medical, etc. We carry out the design of clean rooms, PET and CT rooms, MRI rooms and other complex objects.

    Develops turnkey projects, eliminating the need for you to contact other organizations for engineering surveys, support during the examination, etc.

    Has SRO permits and other permits for project activities. The presence of licenses from Rospotrebnadzor and Roszdravnadzor allows us to carry out work on the design of facilities that use radiation sources and sources of ionizing radiation (medical X-ray machines, screening X-ray equipment, etc.).

    For more than 5 years, he has been successfully cooperating with large customers: industrial companies, airports, customs terminals, logistics organizations, etc.

Stages of development of design and estimate documentation

  • 1 Stage 1 - preparatory. It includes drawing up an architectural and planning task, selecting a site for the construction of an object, preparing initial data for designers, and conducting engineering surveys.
  • 2 Stage 2 - design. It consists in the development of a package of design and estimate documentation, its examination and approval.
  • 3 Stage 3 - post-project. Includes author's supervision of execution construction works and acceptance of the finished facility into operation.

The cost of developing design and estimate documentation (DED)

*Prices are indicated during the development of design and estimate documentation from 3000m2 and are not an offer. The cost may change after agreement on the details of the project.

Service Unit Price
Object design
General plan of the building m2 from 60 rub
Sketch design of the building m2 from 50 rub
Architectural solutions (stage P) m2 from 36 rub
Architectural solutions (P stage) m2 from 70 rubles
Technological solutions m2 from 50 rub
Constructive decisions m2 from 60 rub
Heating system m2 from 15 rub
Ventilation and air conditioning system m2 from 15 rub
Water supply system m2 from 15 rub
sewerage system m2 from 15 rub
Building power supply m2 from 40 rub
Construction organization project m2 from 20 rub
Automation systems for engineering equipment m2 from 25 rub

The cost of developing design and estimate documentation is determined on an individual basis, taking into account the characteristics of the facility and the requirements of the customer. The table shows indicative prices. To calculate the exact cost of a set of design and estimate documentation for your assignment, please contact the managers of IC OLIMP.

What affects the cost of the service?

  • The type of initial data provided and its quality. The better and clearer the initial information, the cheaper the cost of the work.
  • The amount of information initially provided by the client. The company's experts will have to calculate, measure or find the missing information on their own. This parameter will also affect the duration of the work.
  • Requirements for the planned object. For example, the development of design and estimate documentation for equipment of specific brands or using non-standard tools or installations will be more expensive, because all its features will have to be taken into account.

The difference between the design estimate for reconstruction and overhaul and the design estimate for construction

The main difference is that in order to carry out repairs, the customer must provide Additional materials concerning specifications existing buildings, premises, communications. You will definitely need a passport of the object, measurements of areas, information on various surveys carried out on the territory of the object, reports on work already carried out on the territory of the object, if any, etc.

A working project for an existing facility or production can be drawn up in a reduced volume.

What is included in the design and estimate documentation?

The composition of the design and estimate documentation is determined by the type and characteristics of the object, the planned work and other factors. For each object, the composition of the design and estimate documentation will be individual, but it will certainly contain text (general data, reference to legislation, explanatory note and other information), graphic (diagrams, plans, drawings) and calculation (estimates, reports) sections.


In general, the project includes:

  • Explanatory note.
  • The scheme of the planning organization of the site on which the object will be built or is already standing.
  • Architectural, space-planning, constructive, engineering solutions.
  • Project for the organization of construction works (if necessary, also works on dismantling / demolition of capital construction facilities).
  • List of activities to be carried out to comply with security requirements environment, ensuring fire safety, providing access for people with handicapped health.
  • Estimated documentation for the construction (repair, reconstruction) of the facility.
  • Other documentation in cases provided for by law.

Requirements for the composition of project documentation are presented in Decree of the Government of the Russian Federation No. 87 dated February 16, 2008.

We have all permits

Contact the managers of IC "OLIMP" for detailed advice on the procedure for developing design estimates for reconstruction, repair and construction capital buildings and structures.

The overhaul of capital construction projects assumes that:

  • during the repair, building structures that are not load-bearing will be replaced or restored;
  • there will be a replacement of engineering systems or their restoration,
  • some elements of load-bearing building structures can be replaced with similar or better ones in terms of performance;
  • and some modernization is also allowed: for example, it is possible to improve the layout, carry out insulation and sound insulation work, add missing engineering equipment or connect to the main sewerage, water and gas supply networks.

According to the list of additional works presented in Regulations VSN 58-88 (p), this may also include an inspection of the facility, preparation of design estimates, as well as an examination of design estimates for major repairs (see Appendix 9 of this document).

Unlike major repairs, reconstruction affects the main parameters of the object (for example, height, number of storeys, area or volume). Therefore, the process of designing and conducting approvals for reconstruction is much larger than for major repairs. That is why it is important here to correctly determine what kind of changes will be discussed in your case.

Documentation for overhaul:

  1. Project. When the design of a major overhaul is on the agenda, the question often arises: is a project generally needed for a major overhaul of a building? According to Art. 48 of the Civil Code of the Russian Federation, project documentation is required in without fail, except for cases of overhaul of private residential buildings not exceeding 3 floors and intended for one family. At the same time (unlike a project for reconstruction), project documentation is being developed for those engineering systems that are planned to be replaced (for example, a project for a ventilation system or a fire alarm).
  2. The estimate is needed to accurately calculate the upcoming costs, as well as to justify the cost of repairs in order to obtain appropriate funding.
  3. Positive conclusion of the expert organization.

All estimates are checked for the validity of the estimated cost, if it is required to confirm the correctness of the calculations for obtaining budget funds.

But does a project for a major overhaul have to undergo an examination? The answer to this question can be found in Art. 49 of the Civil Code of the Russian Federation.

You can learn more about the design and estimate documentation for a major overhaul, as well as order a major overhaul project for a school, hospital, apartment building or any other building or structure, by contacting our specialists - we will consult on all issues and calculate the full cost of services.